Menu

13.09.2022

Zippe Industrieanlagen GmbH

On the way to success- Zippe Batch House for Vetropack Italy with good progress

At the end of this April, ZIPPE has started the erection of the Batch House for the Swiss glass group VETROPACK in Boffalora. In the meantime, the majority of the silos has been lifted in and the assembly of the equipment has begun.
The order is processed by ZIPPE on a turn-key basis. Later, the plant will supply two melting furnaces. The two Cullet Return Systems are also included in the ZIPPE scope of supply. The plant is expected to go into operation in spring 2023.

Exhibitor Data Sheet